Efficient IT room-in-room systems

DC-ITRoom

Modular, including wall, ceiling and floor elements. With high investment security. Expandable, removable, secure. The best possible protection for your data center.

 
 

DC-ITRoom GranITe

DC-ITRoom

High availability protection of the latest generation for your IT.
Best possible protection for your data center.

DC-ITRoom QuartzITe 9.3

DC_ITSafe

Modular room-in-room system of increased basic protection against major physical hazards.

DC-ITRoom QuartzITe 9.0

Outdoor DC_ITContainer_9.0

Modular room-in-room system of basic protection against major physical hazards.

 
 
 

Comparison DC-ITRooms

Test, values and certifications GranITe QuartzITe 9.3 QuartzITe 9.0
CERTIFICATION (FIRE PROTECTION)


ECB-S certification as per EN 1047-2:2009 and A:2013 🗸 - -
External quality surveillance in production 🗸 - -
External quality surveillance on the building site 🗸 - -
FIRE PROTECTION


Type-tested as per EN 1047-2, 60 minutes flaming plus cooling curve up to 24 hours 🗸 - -
System testing with compliance of threshold values (50 K, 85% air humidity) as per EN 1047-2 over 30 minutes 🗸 🗸 -
”General Approved Test Certificate” according to German building standard F90 🗸 - -
System testing EI 90 as per EN 13501-2/EN 1363-1 from external to internal 🗸 🗸 🗸
System testing EI 90 as per EN 13501-2/EN 1363-1 from internal to external Optional Optional Optional
Component testing (wall/ ceiling) EI 180 as per EN 13501-2/EN 1363-1 from external to internal 🗸 - -
Component testing (wall/ ceiling) EI 120 as per EN 13501-2/EN 1363-1 from external to internal 🗸 🗸 🗸
Component testing (wall/ ceiling) EI 120 as per EN 13501-2/EN 1363-1 from internal to external 🗸 🗸 🗸
BREAK-IN PROTECTION


RC3-Certified to EN 1627/1628/1629/1630 🗸 - -
System testing break-in resistance RC 3 in accordance with EN 1627/1630 🗸 Optional Optional
System testing break-in resistance RC 2 in accordance with EN 1627/1630 🗸 🗸 🗸
EXPLOSION PROTECTION


System testing explosion resistance EXR 3 as per EN 13123-2/EN 13124-2 🗸 - -
FLUE GAS IMPERMEABILITY


System testing flue gas impermeability as per EN 1634-3 🗸 🗸 -
DUST AND WATER IMPERMEABILITY


System audit dust and water impermeability IP 56 as per EN 60529 🗸 🗸 🗸
500 mm water column over 72 hours 🗸 - -
400 mm water column over 72 hours P P P Screening effectiveness (EMC-protection) 🗸 🗸 🗸
EMC-PROTECTION


Screening effectiveness testing as per 50147-1 🗸 🗸 🗸
RESISTANCE TO DEBRIS


Impact testing as per EN 1047-2 (impact energy approx. 3,000 Nm) 🗸 - -
Triple impact as per DIN 4102-2 - 🗸 🗸
Data Center Group